Point of note in the following is the cost $1.3bn for mine,with 140kn rail, price of I/O $63/Taprox.
Old FMS bod had scaled mine costs down from $1.2bn to $750m
Current price of I/O USD$103/T. exchange .6985. Cost 0f production $30/t aprox.
Min stated BCK mine $350m
So, either current bod is building a huge mine or there estimate are at the upper limits of range then some.
Going back to the previous bod there limit fac1tor was the price of I/O.
We the price of I/O has risen, AU$ dropped from the estimated 80c and so has the production costs from $60/T.
So I think SH are in a good place.
http://www.mining.com/fortescue-goes-ahead-1-3bn-iron-ore-project-western-australia/
I’m Holding
GLTA
Looking at the above photo, they definitely need a criminal lawyer on the bod.
- Forums
- ASX - By Stock
- RHK
- FMS - "The Foundation Customer"
FMS - "The Foundation Customer", page-23
-
- There are more pages in this discussion • 611 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RHK (ASX) to my watchlist
(20min delay)
|
|||||
Last
83.0¢ |
Change
0.055(7.10%) |
Mkt cap ! $165.8M |
Open | High | Low | Value | Volume |
82.5¢ | 83.0¢ | 82.5¢ | $2.641K | 3.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 25 | 69.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
80.0¢ | 3000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25 | 0.690 |
1 | 1000 | 0.680 |
1 | 2000 | 0.650 |
1 | 10000 | 0.630 |
1 | 20000 | 0.500 |
Price($) | Vol. | No. |
---|---|---|
0.800 | 3000 | 1 |
0.830 | 26522 | 1 |
0.835 | 5942 | 1 |
0.840 | 13496 | 3 |
0.845 | 14500 | 1 |
Last trade - 13.09pm 18/11/2024 (20 minute delay) ? |
Featured News
RHK (ASX) Chart |