    1   mce-anchorBalla Balla Infrastructure Project - Ship Building Services[Closed Tender] BBI Group Limited Western Australia 07-10-2019[Closed]  
    2   Detailed design, testing, and construction of four (number of) steel hull Transhipment Shuttle Vessels (TSV’s).Vessel Description...  
    3
    4   mce-anchorBalla Balla Infrastructure Project - Dredging Consulting Services[Closed Tender] BBI Group Limited Western Australia 07-10-2019[Closed]  
    5     Provide dredging consulting services including, but not limited toetailed design of dredge and spoil worksDevelopment...  
    6
    7   mce-anchorBalla Balla Infrastructure Project - Iron Ore Testwork Private Western Australia 16-12-2019  
    8   Iron ore testwork package to support feasibility study for a Pilbara based iron ore project.Testwork includes approximately 100 samples and...  
    9
    10   mce-anchorBalla Balla Infrastructure Project - Provision of LiDAR survey services[Closed Tender] BBI Group Limited Western Australia 23-08-2019[Closed]  
    11   Provide Lidar survey services to cover the BBIG Port and other project related locations within the Pilbara.The scope of work shall include,...  
    12
    13   mce-anchorBalla Balla Infrastructure Project - Weelumurra Exploration – Downhole Geophysical Logging[Closed Tender] BBI Group Limited Western Australia 03-08-2019[Closed]  
    14   BBI Group Pty Ltd (BBIG) is proposing a fully integrated port and rail system servicing mining operations in the Pilbara region of Western...  
    15
    16   mce-anchorBalla Balla Infrastructure Project - 200 Pax Floating Accommodation Facility re Charter and Operate[Closed Tender] BBI Group Limited Western Australia 12-07-2019[Closed]  
    17   Provide suitably sized and self-sufficient accommodation vessel(s) and messing in accordance with the below project requirements.The scope of...  
    18
    19   mce-anchorBalla Balla Infrastructure Project - Geotechnical Drilling[Closed Tender] BBI Group Limited Western Australia 30-04-2019[Closed]  
    20   Provision of Geotechnical drilling services to be undertaken at the proposed Balla Balla Port in May 2019 in line with the attached Geotechnical...  
    21
    22   mce-anchorBalla Balla Infrastructure Project - Corporate Intranet[Closed Tender] BBI Group Limited Western Australia 07-03-2019[Closed]  
    23   BBIG require a SharePoint-based intranet-in-a-box solution, inclusive of implementation, training and advisory services, for an install base of...  
    24
    25   mce-anchorSignalling & Comms[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    26   Design, supply, construction and commissioning of rail signalling, train control, asset protection and communications infrastructure for the...  
    27
    28   mce-anchorRoad Over Rail Bridge[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    29   Construction of a road over rail bridge on North West Coastal Hwy including the following:1. Bridge structure, abutment and wing walls.2....  
    30
    31   mce-anchorRail Track[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    32   Construction, installation, testing & commissioning of the Balla Balla heavy haul railway including the following:1. Mainline track...  
    33
    34   mce-anchorPower Transmission & Distribution[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    35   Design, supply, delivery, installation, testing and commissioning of the following:1. Mine Area transmission and distribution infrastructure...  
    36
    37   mce-anchorPower Generation[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    38   Design, finance, supply, delivery, installation, testing, commissioning, operations & maintenance based on a 7 year initial contract period...  
    39
    40   mce-anchorNon Process Infrastructure Buildings[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    41   Design and construction of the Non Process Infrastructure (NPI) buildings including the following:1. Port NPI Buildings - Administration...  
    42
    43   mce-anchorMine Process Plant[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    44   Design, supply, installation, testing & commissioning of the Mine Process Plant including the following elements:1. Ore handling plant -...  
    45
    46   mce-anchorMaterials Handling Machines[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    47   Includes the design, supply, deliver, testing & commissioning of the following:1. Stockyard machines - Port TSV loader and Rail loadout...  
    48
    49   mce-anchorMaterials Handling Conveyors[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    50   Design, supply, installation, testing & commissioning the Port (Separable Portion 1A) and Rail Loadout (Separable Portion 1B) materials...  
    51
    52   mce-anchorJetty[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    53   Design and construction of the Jetty infrastructure including the following:1. Approach Jetty (~1.9km)2. Jetty Head3. TSV Wharf (double...  
    54
    55   mce-anchorCauseway & Quarry[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    56   Construction of a rock armoured causeway including the following elements:1. Quarry establishment & production of rock armour and core...  
    57
    58   mce-anchorCar Dumper Civil Works[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    59   Includes the design, supply, installation, testing & commissioning of two (2) Helix Dumper stations.The package includes the following...  
    60
    61   mce-anchorBulk Earthworks[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    62   Construction of the bulk earthworks, drainage and flood protection for the following:1. Port (Separable Portion 1a) – Port stockyard,...  
    63
    64   mce-anchorAccommodation Camps[Closed Tender] BBI Group Limited Western Australia 01-09-2017[Closed]  
    65   Build, own and operate the following accommodation facilities:1. Construction Camps (Separable Portion 1) – Complete Wet Hire...
 
watchlist Created with Sketch. Add RHK (ASX) to my watchlist
(20min delay)
Last
84.5¢
Change
0.000(0.00%)
Mkt cap ! $168.8M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 12 85.0¢
 

Sellers (Offers)

Price($) Vol. No.
88.0¢ 10355 1
View Market Depth
Last trade - 16.11pm 16/07/2024 (20 minute delay) ?
RHK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.