Should have said: Not that deep, high grade and with a very good profit margin. The grades they quote are equivalent to plus 6% Cu or over $500 a tonne. So a 5 million tonne deposit would have an in-ground value before mining/processing/capital of over $2.5 billion.
Should have said: Not that deep, high grade and with a very good...
Add to My Watchlist
What is My Watchlist?