Guys the figures u have thrown out are incorrect! Please find the true value which is min 200mill not the 60 mill been posted. Thus 50c is easily possible! DYOR and dont listen to people who are missing out. This thing should fly imho.
I have found on http://www.abnnewswire.net/press/en/64313/Pryme_Oil_and_Gas_Limited_(ASX:PYM)_Deshotels_20_H_No1_Flow_Test.html
that there is actually 50,000acres x $10000 an acre is $500m times 40% w/i equals $200, not the $60m predicted by other posters.
And on November 11th this was stated from Justin Pettett
Justin Pettett, Pryme's Managing Director, said "numerous significant hydrocarbon bearing fracture zones and many smaller fractures have been intersected in the horizontal leg. Preliminary evaluation of these along with other data gives us a high degree of confidence that the Deshotels 20-H No.1 well will be completed as a producer."
Add to My Watchlist
What is My Watchlist?