III icon resources ltd

ASX AnnouncementMt Carbine Resource ClarificationIn response to...

  1. 18,199 Posts.
    ASX Announcement
    Mt Carbine Resource Clarification
    In response to an enquiry by the ASX regarding the status of the Mt Carbine resources described
    on page 14 of the Prospectus lodged by Icon on 2 June 2008, Icon makes the following statement:-
    Considerable work was carried out before the Mt Carbine mine shut down in 1987 to estimate
    resources that formed a basis for ongoing tungsten production. This included sampling and
    surveying of the No. 4 tailings dam and review of the resources that formed the basis for the
    underground mine plan. Taking data from the 1985-1987 reports to the Joint Venture Management
    Committee, Dr A.H. White reports the following JORC compliant inferred resources:
     1.6 million tonnes in tailings dam No 4 with an estimated grade of 0.11% WO3, including an
    estimate that the tailings dam contained 400,000 tonnes of minus 75 micron material with an
    estimated grade of 0.3% WO3.
     1,050,000 tonnes in the open pit with a recovered grade estimated to be 0.1% WO3.
     9.6 million tonnes beneath the open pit at an estimated grade of 0.2% WO3,
    Significant exploration potential exists north of the present open pit based on scheelite
    mineralisation in the pit wall and extensive old workings on Carbine Hill. There are also tailings
    dams No 2 and 3, which are expected to have WO3 grades comparable to or better than No 4 dam,
    but whose volumes have to be verified.

    How do those grades compare?
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.