Start of:
2018 - 25MMscf/d
2019 - 42MMscf/d;
2020 - 150MMscf/d (Phase 1) or 200MMscf/d (phase 1 optimised)
2021 - 275MMscf/d (Phase 1) or 375MMscf/d (Phase 1 optimised)
2022 - 300MMscf/d(Phase 1) or 500MMscf/d (Phase 1 optimised) or 600 MMscf/d (Phase 2)
Start of: 2018 - 25MMscf/d 2019 - 42MMscf/d; 2020 - 150MMscf/d...
Add to My Watchlist
What is My Watchlist?