KAMARGA DRILLING UPDATE ZINC ZONE EXTENSION Highlights ? The JB Zinc zone extended 105m along strike to northeast (updip) ? Drilling shows continuity of high grade zones ? Total length confirmed by RMG drilling is now 385m and open ? Review of historical drilling indicates the JB Zone is 1,300 metres in length and open ? Extension hole (JB007)intersected o 99m at 1.35%Zn, 0.41%Pb (1.8%Zn+Pb) from 128m downhole ? Intercepts in JB007 are;1 o 2m @ 5.49%Zn, 9.07%Pb, 19g/tAg (14.6%Zn+Pb) from 179m o 6m @ 3.91%Zn, 0.41%Pb, 3.8g/tAg (4.3%Zn+Pb) from 184m o 2m @ 5.37%Zn, 0.57%Pb, 3.0g/tAg (5.9%Zn+Pb) from 198m o 6m @ 2.81%Zn, 0.32%Pb, 1.6g/tAg (3.1%Zn+Pb) from 210m o 2m @ 4.27%Zn, 0.33%Pb, 2.0g/tAg (4.6%Zn+Pb) from 219m o 3m @ 6.92%Zn, 1.79%Pb, 2.3g/tAg (8.7%Zn+Pb) from 224m ? Drilling is continuing at the JB Zinc prospect 1 Minimum 2m > 3%Zn+Pb, maximum 2m internal dilution
RMG Price at posting:
1.3¢ Sentiment: Buy Disclosure: Held