"Forrest’s plans are – as usual – extremely ambitious. The six-stage project will start with a plan to establish Australia’s first multi-gigawatt-scale electrolyser factory, with an initial capacity of 2 gigawatts (GW) per annum – more than doubling current global production."
It's a gimmick to suck in the gullible and stupid.
2GW = 2 million KW/year = 228KW/hr continuous operation. That is enough to power about a handful of cars or 20 houses.
Considering that >95% of hydrogen is produced by Methane Reforming 'doubling' hydrogen production by electrolysis is meaningless.
Just more 'greenwashing' BS from corporations.
- Forums
- ASX - By Stock
- Forrest to build massive hydrogen, wind, solar and cabling factory in Queensland
"Forrest’s plans are – as usual – extremely ambitious. The...
-
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
|
|||||
Last
$21.41 |
Change
-0.260(1.20%) |
Mkt cap ! $65.92B |
Open | High | Low | Value | Volume |
$21.52 | $21.67 | $21.30 | $150.5M | 7.000M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 93 | $21.40 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$21.41 | 12657 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 93 | 21.400 |
2 | 3150 | 21.350 |
1 | 200 | 21.330 |
2 | 1046 | 21.320 |
1 | 1000 | 21.310 |
Price($) | Vol. | No. |
---|---|---|
21.420 | 1200 | 1 |
21.450 | 1500 | 1 |
21.510 | 2020 | 1 |
21.520 | 951 | 1 |
21.530 | 1500 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online