all very true, but you're missing one of the key qualities of hydrogen, it can be transported from cheap places to expensive places.
So if you produce it cheaply in the pilbara, then transport it to places without say pumped hydro, then you win. Same with lithium batteries, unless you have cheap green power in that location, then they're not green. hydrogen can be used to move that power cheaper that lithium.
Also, whilst you're right to mention other solutions like compressed air.... in the end it just comes down to cost and scale.
There will be a place for hydrogen..... just don't know how big will be the piece of pie.
- Forums
- ASX - By Stock
- FMG
- Forrest to build massive hydrogen, wind, solar and cabling factory in Queensland
Forrest to build massive hydrogen, wind, solar and cabling factory in Queensland, page-56
-
- There are more pages in this discussion • 110 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$19.12 |
Change
0.240(1.27%) |
Mkt cap ! $58.13B |
Open | High | Low | Value | Volume |
$19.03 | $19.18 | $18.97 | $10.70M | 556.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 2004 | $19.11 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$19.12 | 99 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 2051 | 19.030 |
11 | 5627 | 19.020 |
6 | 3862 | 19.010 |
9 | 3080 | 19.000 |
6 | 4105 | 18.990 |
Price($) | Vol. | No. |
---|---|---|
19.040 | 48 | 1 |
19.050 | 1350 | 2 |
19.060 | 4473 | 4 |
19.070 | 7663 | 5 |
19.080 | 3221 | 4 |
Last trade - 10.16am 07/11/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |