And
Swanbank E gas-fired power plant to zero (QLD Government CleanCo)
Stuart Oil Shale (Southern Pacific Petroleum, QERL)
Tarong Energy Combined Cycle Gas Turbine (Wivenhoe)
Gladstone Steel Making Facility (Euroa Steel Plant Project Pty Ltd)
Papua New Guinea to Queensland Gas Pipeline (various)
Moranbah and Nebo Power Station proposal (Transfield)
ZeroGen Clean Coal Power Demonstration Project 2011
Gallilee Basin Power Station (Waratah Coal)
Pinkenba Ethanol Bio-refinery (Primary Energy Limited)
Aurukun bauxite (Pechiny, Chinalco, Alcan, Glencore/Mitsubishi etc etc)
- Forums
- ASX - By Stock
- FMG
- Forrest to build massive hydrogen, wind, solar and cabling factory in Queensland
Forrest to build massive hydrogen, wind, solar and cabling factory in Queensland, page-87
-
-
- There are more pages in this discussion • 79 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$17.49 |
Change
0.300(1.75%) |
Mkt cap ! $53.85B |
Open | High | Low | Value | Volume |
$17.34 | $17.56 | $17.13 | $141.9M | 8.137M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 286 | $17.45 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$17.49 | 26714 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 286 | 17.450 |
3 | 5306 | 17.400 |
3 | 99838 | 17.390 |
3 | 22791 | 17.350 |
1 | 2000 | 17.340 |
Price($) | Vol. | No. |
---|---|---|
17.490 | 26714 | 5 |
17.500 | 9903 | 6 |
17.510 | 27052 | 2 |
17.520 | 5923 | 2 |
17.540 | 21518 | 1 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |