Looks as though there will be another 24 -36 hours at the current site then the transfer to Warhawk which will probably be mid to end of next week now.
Looks like both wells will be brought into production and with the anticipated flows no pumps will be required. Will be interesting to see how they manage the increased flow rates. If both wells flow over 1000 bopd plus the already 200 bopd the tanks will be full in just over a day. The truck company will be loving this.
So will the shareholders.
Big month ahead.