I think Brent was referring to 2022 if we can’t get everything done in 2021. Remember there is a lot to it still
- PSA over the line
- Farm out over the line
- Further in full seismic
- Clearing of the land
- Ordering of the rig
- Delivery of the rig
Also add wet season is from November to March to the ability to get all the above done (I’m sure there is much more than that list) would be impossible by this coming April.
The last thing you want is everyone rushing to and mistakes being made, a $20 milUSD investment by a major will want to be pretty precise in this market with exploration budgets being cut.
A lot to do in 2021 and hopefully drilling Q3 as mentioned by the minister, if not April thereafter.
None of the above changes the potential upside though from a successful well, it’s still huge.
- Forums
- ASX - By Stock
- Forward to the Farm In
I think Brent was referring to 2022 if we can’t get everything...
-
- There are more pages in this discussion • 1,035 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.001(1.45%) |
Mkt cap ! $106.1M |
Open | High | Low | Value | Volume |
6.8¢ | 7.0¢ | 6.7¢ | $120.7K | 1.742M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 341028 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 0.069 |
3 | 362283 | 0.068 |
3 | 162045 | 0.067 |
3 | 162766 | 0.066 |
5 | 573935 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 341028 | 4 |
0.071 | 1064037 | 10 |
0.072 | 897000 | 7 |
0.073 | 1015999 | 5 |
0.074 | 42618 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online