    Landholder concerns about eskom building powerlines across there land.
    Wait till we did it up lol.


    Letter from Jana Visnakova, on behalf of Catrich No. 102 CC, 2
    August 2007:
    Farms: Klaarwater
    Koert Louw Zyn Pan
    At the present time are ranchlands Klaarwater and Koert Louw Zyn Pan (further only “hunting
    farms”) used from the juridical subject Catrich No 102 CC for hunting and tourist purposes.
    Catrich organize annually hunting for 70-100 hunting clients. Except hunting, the farm is visiting
    from clients concentrated for photo-safaris. On account of photo-safaris about 100-150 clients
    visit yearly both hunting farms, so it is possible to say that about 200 clients visit yearly this farm.
    After six years of keeping tourism on “hunting farm” is considerable interest of customer base
    from Europe, USA and lately from Russia. Clients with devotion visit the virgin nature minimally
    umbrage from human being activity. Very positively they evaluative the difference of natural
    conditions of farm, when bush, herbage and flooded forests region change in the neigbourhoods
    of the Limpopo River. And just the from human being intact nature is that, what mostly attracts
    always bigger quantity of our clients from the whole world. The area of the farm, its
    accommodation capacity, quantity of kept animals is no more sufficient to satisfy raised interest of
    the farm visitors. That’s why the representatives of the company Catrich No 102 entered in the
    negotiation with another business subjects from Czech Republic and from Russia.
    The common intention of all participating subjects is to extend existing territory of farms for about
    other 5 000ha, to have more animals, to build about 200 pc hides and in the main, in flooded
    forests areas on border of farms Klaarwater and Koert Louw Zyn Pan to build new hunting camp.
    This camp will be built in accord with contemporary standards of VIP clientele in natural style,
    entirely from traditional natural materials, in order to not to disturb yet intact nature. Water for new
    natural camp will be pumped from two water wells in the place of camp sources and convenience
    of the camp place, only one place is responding to this requirements – place on the border of
    both farms on the hill above wide green field with the view as to the natural bush, so the flooded
    forest areas of the farm. Electric energy source for new camp will be done with cable connector in
    earth from the place of inhabited territory. Accent will be again se first of all to undisturbed intact
    nature of both farms.
    For common entrepreneurial intention plan the newly arose union to invest in Limpopo province
    about 10-15 million euros. To the common company will be enclosed the present “hunting farm”
    which was for this purpose appreciated with the volume of 4 million euro. The high economical
    valuation of the “hunting farm” is given partly with its contemporary estimation, evaluation of
    animals and first of all with intact natural conditions. Here we must to suggest, that if the
    unaffected natural environment will be disturb, for example with building up of high voltage
    transmission line of electric energy, the market price of the “hunting farm” will considerably
    decrease. The market price of the farm would then be 1-1.5 million euros. Beyond the decrease
    of the market price of the “hunting farm” in case of build up of the high voltage transmission line of
    electric energy across the territory of the “hunting farm” it will come to considerable decrease of
    clientage and to the damage increase to supposed 1-1.5 million euros for each calendar year.
    The damage caused by die build up electric line across the “hunting farm” would so achieve at
    once 2.5-3 million euros and annual decrease of revenues for 1-1.5 million euros. Economic
    intention is counting with the minimal duration of business on territory of the “hunting farm” for a
    period of 15 years. The supposed total losses arisen with the build up of the high voltage
    transmission line will present about 25 million euros.
    From the above mentioned reasons and due to arise of the damage of 25 million euros (R230
    million) during the time of the minimal existence of this economic intention, we absolutely do not
    agree with the intention of the build up of high voltage line of electric energy across the private
    territory of the farm Klaarwater and Koert Louw Zyn Pan.
    Response:
    Mrs Visnakova was visited on her farm on the 14th September. This is following earlier visits by a
    number of the specialists. Her concerns were noted and incorporated into the overall assessment
    of the preferred routes.
 
watchlist Created with Sketch. Add RES (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.