GNX 0.00% 27.5¢ genex power limited

Ok, all of that is great. Then, what about the power needed to...

  1. 179 Posts.
    lightbulb Created with Sketch. 19
    Ok, all of that is great.

    Then, what about the power needed to pump the water? Could the 50MW be used when not in demand? I know there were issues that needed to be worked out about GNX using their own excess power as opposed to buying it back?

    In reality the power for the hydro isn't needed until 2024, so realistically wind and solar could be done within that timeframe?
 
watchlist Created with Sketch. Add GNX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.