FOX BOARD GIVES HEAP LEACH PLANS THE GREENLIGHT &
ANNOUNCES A RETURN TO PRODUCTION IN 2010
• Fox to return to nickel and copper production at Radio Hill
• Using a low cost heap leach production alternative
• The decision is based on successful column recoveries, high value end-products
and very attractive cash flow projections
• Aim of commissioning in the second half of CY 2010, with a minimum target of 5
years mine life
• Snowden engaged to develop mine plans for heap leach material year two and
Add to My Watchlist
What is My Watchlist?