So GGP entered into talks and agreed to pay a $500,000 fee if they pulled out of the deal only to discover in a matter of weeks or a month or two that FP was a dud, and pulled out , costing them 500k.
It could have happened like that but I think if it was only about FP then GGP would have waited or reduced the break out fee.
My thoughts only.