TBE following should answer your question taken from March QTLY
The frac program has been designed to frac the lowermost zone first. This stage will then be flowed back to clean up frac fluid and establish a flow rate for the zone. This zone will then be sealed off and a similar procedure will be used for each of the stages in the program. In between fraccing each zone, the frac spread will be demobilized to the AWE wells to perform their frac programs, and will then return to Arrowsmith-2 to complete the program. This avoids having the frac spread on standby rates between fracs and whilst waiting for flow testing to be completed.
The well testing phase is not designed for long-term testing with full cleanup of fluids, but will test for hydrocarbon production to surface. High flow rates are not expected from this program, as with any other shale gas evaluation program.
It is expected that this program will be conducted at Arrowsmith-2 and the two AWE wells over a period of approximately 6-8 weeks.
Although the High Cliff Sandstone tight gas target is a secondary objective in this program, if results prove favorable, this well could ultimately be converted to a commercially producing gas well.
- Forums
- ASX - By Stock
- NWE
- frac date
frac date, page-10
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)