Well from the ann's from nwe and awe, i would think included in tomorrows ann is that the frac unit is back on site to do round 2 or has already started.
From AWE Qly
The planned stimulation campaign will incorporate activity
at three wells; Arrowsmith-2 (AWE 44.25%), Woodada Deep-1
(AWE 100%) and Senecio-2 (AWE 50%). A total of five zones
are planned for testing at Arrowsmith, with three zones to be
tested at Woodada Deep and a single zone at Senecio. The
activity at Senecio follows the successful flow testing of the
initial well in 2007.
so the unit left us on the 30/7. only one zone at Senico which is within 40 km of A2. only 3 fracs at Woodada.
depending on the order these are being done, but imo they would have completed 3 zones by now if they went to woodada.