CTP 1.85% 5.3¢ central petroleum limited

As for Santos 8 well drill then follow by horizontal fraccing...

  1. 8,178 Posts.
    lightbulb Created with Sketch. 2378


    As for Santos 8 well drill then follow by horizontal fraccing which should be started by Jan 2014 looks like behind schedule

    Only the top holes have been done 44/45 east mereenie 19/20/21/22/23/24/ west mereenie so far.

    Looks like waiting on main rigg to complete wells .

    I believe they are connecting pipe line s at the moment and getting infrastucture completed site camps update etc.

    When alls that done hopefully look more promising for CTP DOLLAR PER ACRE TO THE 100
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.001(1.85%)
Mkt cap ! $39.49M
Open High Low Value Volume
5.4¢ 5.5¢ 5.3¢ $12.07K 219.8K

Buyers (Bids)

No. Vol. Price($)
1 163385 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 300000 1
View Market Depth
Last trade - 15.44pm 01/11/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.