ICN 0.00% 0.6¢ icon energy limited

free fall

  1. 1,401 Posts.
    lightbulb Created with Sketch. 107
    This could be part of the reason beach's SP is in free fall. Encounter fracture stimulation now due to early April.

    Jan Drilling Report : A workover rig is milling out a packer within the Encounter-1 wellbore in PEL 218 (Beach 100%) to enable the commencement of fracture stimulation activities now expected to occur in mid February.

    Feb Drilling Report: Workover operations have successfully cleaned out the Encounter-1 wellbore in PEL 218 (Beach 100%). Tubing will now be installed ready for the fracture stimulation activities which are now expected to occur in early April once the fracture stimulation crew has completed a program with the Cooper Basin Joint Venture (Beach 20.21%).
 
watchlist Created with Sketch. Add ICN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.