This could be part of the reason beach's SP is in free fall. Encounter fracture stimulation now due to early April.
Jan Drilling Report : A workover rig is milling out a packer within the Encounter-1 wellbore in PEL 218 (Beach 100%) to enable the commencement of fracture stimulation activities now expected to occur in mid February.
Feb Drilling Report: Workover operations have successfully cleaned out the Encounter-1 wellbore in PEL 218 (Beach 100%). Tubing will now be installed ready for the fracture stimulation activities which are now expected to occur in early April once the fracture stimulation crew has completed a program with the Cooper Basin Joint Venture (Beach 20.21%).
- Forums
- ASX - By Stock
- ICN
- free fall
free fall
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
ICN (ASX) Chart |
Day chart unavailable