“why lie? The two plants he indicated to be connect first were traditional 1000GW + reactors, not SMRs”
Hello, I see you’re right up on this huh
“The Coalition says it could have the first two plants operational between 2035 and 2037 – the former date if it opts for small reactors and the latter date if it opts for large reactors”
https://www.abc.net.au/news/2024-06...tm_campaign=abc_news_app&utm_content=link
I won’t wait for an apology
- Forums
- Political Debate
- French nuclear giant scraps SMR plans due to soaring costs, will start over
“why lie? The two plants he indicated to be connect first were...
-
- There are more pages in this discussion • 208 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online