i like this part in the last ann .... "The production schedule is still under review to investigate opportunities to lower
the cut-off grade (the current gold price is more than double the feasibility study
base line) and fully utilise the process plant installed capacity earlier than originally
scheduled. Initial feed for the mill will comprise the existing low grade stock pile,
the scheduled cut back ore exposures and a recently designed box cut,
up to 70 metres wide, in the floor of the existing pit, once dewatered"
- Forums
- ASX - By Stock
- RED
- friday night gold rally?
friday night gold rally?, page-9
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RED (ASX) to my watchlist
(20min delay)
|
|||||
Last
38.0¢ |
Change
0.020(5.56%) |
Mkt cap ! $2.584B |
Open | High | Low | Value | Volume |
36.0¢ | 38.0¢ | 35.8¢ | $6.857M | 18.55M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
41 | 733237 | 37.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
38.0¢ | 1770475 | 68 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
42 | 793815 | 0.375 |
41 | 2253578 | 0.370 |
18 | 903388 | 0.365 |
26 | 714549 | 0.360 |
25 | 621239 | 0.355 |
Price($) | Vol. | No. |
---|---|---|
0.380 | 1658919 | 66 |
0.385 | 1011021 | 18 |
0.390 | 606655 | 13 |
0.395 | 755795 | 12 |
0.400 | 856178 | 10 |
Last trade - 14.00pm 01/07/2024 (20 minute delay) ? |
Featured News
RED (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online