RED 5.56% 38.0¢ red 5 limited

i like this part in the last ann .... "The production schedule...

  1. 2,926 Posts.
    lightbulb Created with Sketch. 9
    i like this part in the last ann .... "The production schedule is still under review to investigate opportunities to lower
    the cut-off grade (the current gold price is more than double the feasibility study
    base line) and fully utilise the process plant installed capacity earlier than originally
    scheduled. Initial feed for the mill will comprise the existing low grade stock pile,
    the scheduled cut back ore exposures and a recently designed box cut,
    up to 70 metres wide, in the floor of the existing pit, once dewatered"
 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
38.0¢
Change
0.020(5.56%)
Mkt cap ! $2.584B
Open High Low Value Volume
36.0¢ 38.0¢ 35.8¢ $6.857M 18.55M

Buyers (Bids)

No. Vol. Price($)
41 733237 37.5¢
 

Sellers (Offers)

Price($) Vol. No.
38.0¢ 1770475 68
View Market Depth
Last trade - 14.00pm 01/07/2024 (20 minute delay) ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.