The mill site is on sloping ground with one stream on the northern side. This is separated from the site with a temporary bundwall and will not cause any problems.The tanks and the ground underneath the mill was caprock and clay down to the harder rocks at roughly 4 metres. All of this was removed and used for the bundwall. The foundations for the tanks and the mill were then rebuilt under geotech supervision using standard techniques. For those of you who are unfamiliar with site preps, the foundations were laid in 200mm layers, watered and rolled with compaction testing done as it proceeded. The testing was both penetrometer and nuclear density. Again this is nothing special and is what is always done to prepare the ground for such large structures. The tanks had their ringbeams poured and then the interior of the beams were also filled under geotech supervision. A final layer of concrete was then poured for the tanks to sit on.
No concrete was poured for the mill and the mill was left standing beside its new home.
I was present while this was done and can assure you that there are no issues with the foundation material for the mill supports.
Why it was stopped is way above my pay grade but the site and the earthworks for tanks and mill are not the reason.
- Forums
- ASX - By Stock
- From the Directors
PTN
patronus resources limited
Add to My Watchlist
3.17%
!
6.5¢

The mill site is on sloping ground with one stream on the...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
6.5¢ |
Change
0.002(3.17%) |
Mkt cap ! $106.4M |
Open | High | Low | Value | Volume |
6.3¢ | 6.5¢ | 6.2¢ | $38.52K | 607.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 120869 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 263750 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 120869 | 0.062 |
5 | 208821 | 0.061 |
5 | 156666 | 0.060 |
2 | 105700 | 0.059 |
2 | 182224 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 63750 | 2 |
0.066 | 20000 | 1 |
0.067 | 165661 | 4 |
0.068 | 80115 | 2 |
0.069 | 1825826 | 4 |
Last trade - 16.10pm 11/07/2025 (20 minute delay) ? |
Featured News
PTN (ASX) Chart |
The Watchlist
VMM
VIRIDIS MINING AND MINERALS LIMITED
Rafael Moreno, CEO
Rafael Moreno
CEO
SPONSORED BY The Market Online