Yes Farmer but you are failing to acknowledge Spid’s prospects of Lindi Jumbo from a far. His CAD abilities have already shown all the Jumbo’s were destroyed from blasting and processing from the crusher circuit. He claims Lindi’s processing plant failure will deliver zero graphite as its plant was designed around weathered material even though from day one the project has reported 95% fresh material. I’ve started this thread to bring awareness to Spid’s call on Lindi Jumbo’s DFS not holding up on any level and due to the above and to bring awareness of WKT’s potential in the lucrative large flake course graphite market.
- Forums
- ASX - By Stock
- WKT
- FuDgeS Catastrophic Fail
FuDgeS Catastrophic Fail
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
-0.005(3.85%) |
Mkt cap ! $83.90M |
Open | High | Low | Value | Volume |
13.0¢ | 13.0¢ | 12.5¢ | $10.71K | 83.23K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 69810 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 43105 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 69810 | 0.125 |
4 | 241071 | 0.120 |
4 | 195216 | 0.115 |
4 | 519818 | 0.110 |
7 | 319976 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 35329 | 1 |
0.135 | 420959 | 7 |
0.140 | 312924 | 2 |
0.145 | 108000 | 2 |
0.150 | 107272 | 3 |
Last trade - 15.58pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
12.5¢ |
  |
Change
-0.005 ( 3.85 %) |
|||
Open | High | Low | Volume | ||
12.8¢ | 12.8¢ | 12.5¢ | 8651 | ||
Last updated 15.24pm 03/05/2024 ? |
Featured News
WKT (ASX) Chart |