I hope is about to be revealed very soon, lol!
As per DGH's earlier posts:
"Montenegro:
This project is said to be 20 times larger then Peelwood North with an immediate potential to commence mining.
The Co. advised that we are currently working on a JORC conversion process, which is being prepared by geologists from Golder Associates.
Sultan's estimation of the tonnage of mineralised material at the exploration target site is 7.7 to 9.6 million tonnes ranging from 2.3-2.7% Zn, 1.5-2.7% Pb, 0.2-0.23% Cu and 17-24 g/t Ag. This is based on the three significant deposits: Brskovo, Visnjica and Zuta Prla."
The above facts are significant and if the Co. can prove true to the above i.e. JORC compliance, we will be on a winner!!! My prediction, 3.5c tomorrow and 5c by the end of the week with hopefully some good news soon!
I hope is about to be revealed very soon, lol! As per DGH's...
Add to My Watchlist
What is My Watchlist?