simpson 8 announcement At 6:00 am today, the Simpson-8 well has drilled to a depth of 1,244 metres measured depth and will continue to drill ahead to the planned total depth of 2,090 metres measured depth.
The Simpson-8 well is being drilled from the Simpson Bravo platform as a sidetrack from Simpson-1. The well is designed to appraise an additional drainage point for oil not accessed by current wells in the Simpson Field.
The Simpson-8 well is expected to take 2 days to reach its prognosed total depth. If successful the well will be immediately brought onto production.
Harriet Joint Venture Participants:
Tap Oil Limited 12.2229%
Apache Energy Limited (Operator) 68.5%
Kufpec Australia Pty Ltd 19.2771%
- Forums
- ASX - By Stock
- fundamentals are terrific...suit a long term inves
simpson 8 announcement At 6:00 am today, the Simpson-8 well has...
Featured News
Add TAP (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online