G'Day hatmopit-Of course the objective is to generate positive cash flow, if that
can be done with the gravity plants current configuration & recovery enhanced
with higher gold grades from the intermediate zone & soon to be accessed
reported being even high grades in level 6 & we hope through to 7 , 8
& deeper then great.
We just have to await the differential between the two plants -ours configured
with out a small ball mill & CIL , should the differential be about the 20% mark
then ok the gold going to tails & can be recovered at a latter time as its not lost.
If however the margin is higher due to not only not having a CIL circuit,
EG -optimal grind not being achieved on a continuous reliable through-put basis
not having a small ball mill, then their are good second hand CIL circuits
& ball mills that can be sourced.
I don't think it has to be new or a prolonged shut down for implementation ,
especially if we can toll treat our existing tailings & can redeploy the capital
generated into increasing Cascavels gravity plants recovery.
Their is no clear direction as yet the results pending vs Cascavels gold recovery
(the differential ) & whether we can generate positive cash flow with the current
configured gravity plant will determine the future options available.
There are future alternate options if needed & economically justified .
salt
- Forums
- ASX - By Stock
- Fundamentals
G'Day hatmopit-Of course the objective is to generate positive...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OGX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online