This is the only reference I have ever seen to the transfer price (it is on page 15 of the 2021 annual report) about this time last year.
"The Sengkang Power Plant is held under a Build, Own and Operate (BOO) structure. The Power Purchase Agreement (“PPA”) has terms which include the right for PLN to purchase the power plant from us at a price determined with reference to a formula. At this time PLN has not chosen to exercise such right."
The value of the plant is broadly equal to the spark spread between the gas and the electricity. But the plant is the primary user of the gas. Therefore the PPA determines the value of the plant and the PSC. Hard to know who is wearing the boots in this negotiation especially if the Indonesian can tolerate some blackout/brownout risk.
- Forums
- ASX - By Stock
- EWC
- Further delays at Pagbilao LNG Plant
Further delays at Pagbilao LNG Plant, page-53
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
-0.001(9.09%) |
Mkt cap ! $30.78M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 0.9¢ | $86.60K | 8.628M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 364002 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 788000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 364002 | 0.009 |
7 | 1370000 | 0.008 |
3 | 1015724 | 0.007 |
2 | 2250000 | 0.006 |
2 | 500000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 788000 | 2 |
0.013 | 180000 | 1 |
0.014 | 298500 | 1 |
0.015 | 1052 | 1 |
0.016 | 725000 | 2 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |