JUT jutt holdings limited

further high grade intersections, page-2

  1. 217 Posts.
    ASX ANNOUNCEMENT (ASX Code: JUT)
    8 January 2008
    Copper/Zinc/Lead with Gold/Silver Mineralisation Extended in Drill Results at the Liberty – Indee Project Evelyn Prospect and Copper/Zinc/Gold/Silver Drill Results at Quarmby Prospect
    HIGHLIGHTS
    • Further drill results confirm extension of mineralisation at Evelyn prospect
    • 215m strike for Cu-Zn-Pb-Au-Ag poly metallic mineralisation, open ended to the North East
    • Best results JER006 20.0%Cu,13.0%Zn: JER008 3.4%Cu, 5.65%Zn: JER004 2.5%Cu, 1.9%Zn, 4g/tAu: JER003 1.0% Cu, 2.6%Zn at Evelyn Prospect
    • 2 stoped bodies, one of higher grade occur over a 120m VTEM anomaly delineated at Evelyn prospect,
    • Preliminary drilling results from Quarmby Prospect highly encouraging with subsurface mineralisation outlining a stratiform style of deposit
    • Anticipate further drill results in 3 weeks
    Further encouraging drill results have been received at the Company’s Evelyn prospect confirming the extension of the poly metallic mineralisation announced in the previous drilling update.
    Also, results from 2 drill holes out of 9 holes drilled at the Quarmby Prospect have been received and confirms Cu-Zn-Au-Ag mineralisation.
    These further preliminary results are summarised in Tables 1 and 2.
    Jutt Holdings Limited
    Tel. +61 8 6424 9188 Fax. +61 8 9463 7836
    Place of Business: 1st Floor, 35 Richardson Street, West Perth, WA 6005, AUSTRALIA
    Registered Office: Suite 1, 1233 High Street, Armadale, Victoria 3143, AUSTRALIA
    Email: [email protected]
    Table 1: Evelyn Prospect
    Drill hole #
    Cu (%)
    Zn (%)
    Pb (%)
    Au (g/t)
    Ag (g/t)
    Interval Comm
    ents
    JER002
    0.17
    (39m)
    12-51m
    JER003
    0.53
    (8m)
    38-46m including
    JER003
    0.43
    0.92
    5.5
    (2m)
    42-44m
    JER003
    1.00
    2.55
    0.51
    0.45
    42
    (1m)
    53-54m
    end of hole
    JER004
    1.55
    1.1
    0.32
    1.9
    14.7
    (3m)
    5-8m
    JER006
    6.45
    3.24
    1.05
    0.86
    67
    (10m)
    33-43m
    JER007
    0.97
    (2m)
    15-17m
    JER007
    0.15
    0.22
    (5m)
    22-27m
    JER007
    0.14
    0.25
    (3m)
    29-32m
    JER008
    1.5
    2.8
    0.53
    0.62
    40
    (6m)
    46-52m
    Table 2: Quarmby Prospect
    Drill hole #
    Cu (%)
    Zn (%)
    Pb (%)
    Au (g/t)
    Ag (g/t)
    Interval
    JQR004
    0.79 0.27
    0.48
    0.85
    (4m)
    10-14m including
    JQR004
    1.3
    0.2
    0.95
    1.75
    (2m)
    10-12m
    JQR005
    0.11
    (3m)
    7-10m
    Evelyn and Quarmby
    The Company is highly encouraged by the assay results of RC drilling (NQ drill bit) from the Evelyn prospect particularly with results between Drill Holes JER003-JER004-JER006-JER008, which confirms a 215 metre record of Cu-Zn-Pb-Au-Ag (CZPAA) mineralisation which requires infill drilling to determine the resource potential. Quarmby is exhibiting a stratiform style of deposit which will be further elaborated on when drill results are received in about 3 week’s time.
    Further drill results – Future Drilling
    Assay results from 299 remaining samples are expected in about 3 weeks which will provide further information on the entire drill samples from Evelyn, Quarmby and selected VTEM targets drilled in the 2007 drilling program.
    Initial results are highly encouraging as the mineralisation occurs from surface. The final results once fully interpreted will enable a follow up drill program to be undertaken to better outline the resource potential
 
watchlist Created with Sketch. Add JUT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.