Brilliant! No wonder the treeshakers were a shakin
Angers
BUCKLEY RIVER PROJECT – ANTHILL PROSPECT UPDATE:
FURTHER HIGH GRADE OXIDE COPPER INTERCEPTS & SULPHIDE MINERALISATION POTENTIAL IDENTIFIED
•
Final analytical results from recent RC drilling confirms strong oxide copper intersections
•
Significant new oxide results include:
BR07014 64 metres at 2.26% Cu from 83 metres including 11 metres at 6.43% Cu from 111 metres
BR07021 31 metres at 1.23% Cu from 77 metres
BR07031 13 metres at 1.61% Cu from 30 metres
•
Results indicate strong copper sulphide intercepts beneath the oxide blanket.
•
Significant sulphide intercepts include:
BR07014 7 metres at 1.12% Cu from 148 metres
BR07023 11 metres at 1.73% Cu from 99 metres
BR07027 17 metres at 1.87% Cu from 55 metres
•
Numerous ore grade intercepts outline oxide copper mineralisation over an area of 600 metres x 300 metres. Mineralisation remains open in several directions
•
Resource estimation is in progress with an inaugural Mineral Resource due in December.see full report. Excellent read on ASX
CUO
copperco limited
further high grade oxide copper intercepts
Add to My Watchlist
What is My Watchlist?