The ASX release today by Forte further backs the quality of the ground in very close proximity to where EZE has a significant interest. Bodes very well for EZE's future prospects. Muzz
FURTHER HIGH URANIUM GRADES IN FINAL ASSAYS
FROM BIR EN NAR RESOURCE DRILLING
GRADES OF UP TO 5,424ppm U AS INITIAL JORC RESOURCE NEARS COMPLETION
? Excellent results from final 25 holes of resource drilling at BIR EN NAR Uranium
Project, Mauritania (West Africa) including
o 24m @ 1,116ppm U incl. 1m @ 5,424ppm U
o 11m @ 803ppm U incl. 1m @ 3,345ppm U
o 14m @ 511ppm U incl. 1m @ 3,035ppm U
o 17m @ 504ppm U incl. 1m @ 4,102ppm U
? Results consistent with previously reported assay results from the first 29 holes,
which reported grades of up to 6,310ppm U
? All assay results from resource drilling now received and provided to Coffey
Mining for incorporation in the initial JORC compliant Mineral Resource estimate
International uranium company Forte Energy NL (ASX / AIM: FTE; ?Forte Energy?) is pleased
to report that all assay results have now been received from its +5,500m resource drilling
program at its 100% owned Bir En Nar Uranium Project, located in the Republic of
Mauritania, West Africa.
The results have confirmed the high-grade nature of the uranium mineralisation at Bir En Nar,
with grades of up to 5,424ppm U received in the final batch of 25 drill holes. Grades of up to
6,310ppm U were achieved in the first 29 drill holes.
Add to My Watchlist
What is My Watchlist?