The eafd from smorgon is a short term contract supply,where is the long term eafd coming from and what about extra eafd to make up the 35ktpa.
Intec has never come through with the goods on any project,even the poly jv is still not producing the 60ktpa projected output.
- Forums
- ASX - By Stock
- future
The eafd from smorgon is a short term contract supply,where is...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SDV (ASX) to my watchlist
(20min delay)
|
|||||
Last
63.0¢ |
Change
0.035(5.88%) |
Mkt cap ! $119.5M |
Open | High | Low | Value | Volume |
62.0¢ | 66.0¢ | 60.0¢ | $225.4K | 357.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1680 | 59.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
64.0¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1680 | 0.595 |
2 | 10850 | 0.590 |
3 | 78620 | 0.580 |
1 | 100000 | 0.565 |
2 | 20950 | 0.530 |
Price($) | Vol. | No. |
---|---|---|
0.640 | 50000 | 1 |
0.660 | 16712 | 2 |
0.675 | 158 | 1 |
0.680 | 1600 | 1 |
0.700 | 70000 | 2 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
SDV (ASX) Chart |