ETR 0.00% 0.7¢ entyr limited

John. "major objective" is very ambiguous. They drilled to TD...

  1. 21,423 Posts.
    lightbulb Created with Sketch. 2096
    John. "major objective" is very ambiguous. They drilled to TD and clearly they wanted to test the lowest sections which they couldn't do with A#4. And, they only didn't continue there because the operator didn't want to shut off the whole well and use any of those zones as the commercial section for the entire well. They could very easily have just moved on knowing what was in the logs and wanting a higher production from A5.
    Let's not draw too many conclusions from what really is pure hearsay.
    There is still 70% of the "pay" to test!!! Those jumping ship are well rid of for mine and provides excellent opportunities for those that are more optimistic and PATIENT!! Hopefully they were some of our negative posters!!
    Money for old rope.
 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.