The Monitor farm in was to PEL 115 which ITC used to be part of but VPE was left with 100%.
The press release has VPE operating so it may even help western margin drilling costs since the more wells in a campaign with a drill rig, the better the day rate can be negociated.
Add to My Watchlist
What is My Watchlist?