The Monitor farm in was to PEL 115 which ITC used to be part of but VPE was left with 100%.
The press release has VPE operating so it may even help western margin drilling costs since the more wells in a campaign with a drill rig, the better the day rate can be negociated.
The Monitor farm in was to PEL 115 which ITC used to be part of...
Add to My Watchlist
What is My Watchlist?