They are varying it quite alot to find what the optimum flow is. I don't think it is on pump either yet. Last I knew it was flowing at 735bopd.
Just like the G1 and G2 wells are also being constrained and I hope that they will get them up towards to 150 bopd each. Talking to Greg Smith, their preference is to keep rates at a more long term sustainable level rather than destroy the well bore.
Makes sense.
Add to My Watchlist
What is My Watchlist?