They are varying it quite alot to find what the optimum flow is. I don't think it is on pump either yet. Last I knew it was flowing at 735bopd.
Just like the G1 and G2 wells are also being constrained and I hope that they will get them up towards to 150 bopd each. Talking to Greg Smith, their preference is to keep rates at a more long term sustainable level rather than destroy the well bore.
Makes sense.
They are varying it quite alot to find what the optimum flow is....
Add to My Watchlist
What is My Watchlist?