ITC's report today stated that the G4 well should be in production by early October.
I also read between the lines in the comments about a channel sandstone that was found and that they anticipate it will add substantially to the current oil flows. Could it be with this sandstone that it may see flow rates significantly higher than the first 2 wells.
Wouldn't it be a great result to have a birkhead well flowing a 6-700 barrels. It does happen in the Cooper eg Callawonga and flax fields from memory (don't quote me).
Add to My Watchlist
What is My Watchlist?