KPO 33.3% 0.4¢ kalina power limited

You are right Beaches .But you can't kiss all the girls and...

  1. 194 Posts.
    lightbulb Created with Sketch. 216
    You are right Beaches .But you can't kiss all the girls and developing a modular system is both time consuming and expensive.The challenge for KPO has been to develop a showcase system it controls with a massive market and delivering both the vendors and the builders.
    This is what takes time and effort and most of all;focus.The kalina plants have always been owned and operated by others.
    Ever tried to drop in for a visit to an operating steel mill to have a look at section of plant? Good luck!
    It has not been six years.It has been three!
    I think this management team understand the challenges and are well versed in dealing with the various components of the adoption of a new power cycle.They hae achieved a lot in a relatively short space of time.I think they are close but would be concerned if I did not see something very tangible by June.
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.001(33.3%)
Mkt cap ! $9.946M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $304 75.94K

Buyers (Bids)

No. Vol. Price($)
18 22849362 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 4362752 4
View Market Depth
Last trade - 10.15am 13/06/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.001 ( 0.00 %)
Open High Low Volume
0.3¢ 0.3¢ 0.3¢ 750000
Last updated 12.24pm 13/06/2024 ?
KPO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.