ETR 0.00% 0.7¢ entyr limited

games, page-23

  1. 1,079 Posts.
    Oilman so when do you think we will hear about flow rates

    Your confusing me a little. 2 post before you wrote

    "It won't take several week to get it installed dmasive. Just need couple of days."

    Then your last post said this,
    "Couple of days of installation is a bit too long for a normal operation for just 1000m depth. From installation to optimised stable flow rate would take a week or so as they need to ramp up production slowly. Fingers cross this will flow commercially."

    Considering the equipment hasnt arrived and its probably another ten + days away by the feb20 rns. Plus your week or so of install to optimise

    So that could make it the back end of march
 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.