STX 0.00% 20.5¢ strike energy limited

Gas Flow Update, page-2

  1. 676 Posts.
    lightbulb Created with Sketch. 23
    I think that since they are still pumping water out at the same rate there is no chance for gas shows just yet. The gas should be forming in the de-watered spaces left behind. Gas phases into the gas phase when there's empty spaces. There would be a halo of water volume surrounding the pipe inlet as it is pumped out. Not until it is totally sucked that there will be empty spaces remaining.

    It would be easy to lose faith in the project while waiting for this underground lake to dry out. 100,000 metres of de-watering approx. 85 - 90% of the job done. It is a water aquifer hosted in a coal seam. Hopefully for shareholders it will soon be a productive gas resource.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
20.5¢
Change
0.000(0.00%)
Mkt cap ! $587.4M
Open High Low Value Volume
20.5¢ 21.3¢ 20.0¢ $1.823M 8.814M

Buyers (Bids)

No. Vol. Price($)
6 1249073 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
21.0¢ 269971 4
View Market Depth
Last trade - 16.10pm 18/09/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.