They wont conduct a flowtest until they've cored the reservoir & run logs at TD.
These days its practically unheard of anyone conducting a test, prior to logging & picking any potential intervals.
Depending on what the wireline logs tell them (in tandem with the gas chromatograph readings), they may pick the best possible section, with decent porosity (7-12%) to test, after setting the liner.
Just have to see what they tell us nxt week.
- Forums
- ASX - By Stock
- gas in the elang-plover, gas in sandstone abov
They wont conduct a flowtest until they've cored the reservoir &...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)