ARH australasian resources limited

gas moderator

  1. 2,950 Posts.
    lightbulb Created with Sketch. 117
    ARH will need one of these as well and with Onslow only 120 klms from these projects and around $5 billion of infrastructure is planned the supply of gas would be of great importance to both ARH and Citic Austrian Energy & Environment (Australia) has been awarded the
    Turnkey EPC Contract for a 450MW Combined Cycle Gas Fired Power
    Plant in Western Australia
    Austrian Energy & Environment (Australia) announces that it has secured a
    turnkey EPC design, supply and erection contract for CITIC Pacific Mining, an
    Australian registered company and a subsidiary of one of the largest
    companies listed on the Hong Kong stock exchange, CITIC Pacific, for a
    nominal 450MW Combined Cycle Power Plant.
    The Sino Iron project is a world class, large-scale magnetite iron ore project
    located 100km south west of Karratha, in Western Australia’s Pilbara region.
    The project has over two billion tonnes of identified magnetite resources and
    CITIC Pacific plans to export 27.6 million tonnes per annum (mtpa) of a
    mixture of high grade iron ore concentrate and pellets for 25 years. This
    makes the Sino Iron project the largest planned magnetite project in Australia.
    For Austrian Energy & Environment, the scope includes the design, supply
    and installation of a nominal 450MW Combined Cycle Gas Fired Power Plant,
    comprising three blocks, each block consisting of two gas turbines, two AE&E
    dual pressure Heat Recovery Steam Generators (HRSG) and one steam
    turbine. The gas turbines have a nominal output of 47MW each while the
    steam turbines are nominal 57MW units. An additional seventh Gas Turbine is
    also to be installed for operation in open cycle, however the plant has been
    designed to operate predominantly in Combined Cycle mode. A water
    treatment plant, cooling water system, Instruments and Controls, foundation
    and civil works, high, medium and low voltage electrics, erection,
    commissioning and testing are also included in the scope.
    The power plant will be commissioned in phases and is scheduled to produce
    electricity from 2009.
    About
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.