the 3D over Stuart's Arwon prospect is going to cost around $250K.
Considering drilling only costs about $1.5m, thats a fair chunk of change.
Ian Whitchurch
PS VPE has a lot of acreage in the Cooper. Pity most of it sucks (ie PEL86,87 and 88).
Add to My Watchlist
What is My Watchlist?