the 3D over Stuart's Arwon prospect is going to cost around $250K.Considering drilling only costs about $1.5m, thats a fair chunk of change.Ian WhitchurchPS VPE has a lot of acreage in the Cooper. Pity most of it sucks (ie PEL86,87 and 88).
MKT The ASX can overlook its Telecomm small-caps. Here’s one diversified brand with an international footprint
Week 44 Wrap: Relatively boring week ahead of US election; HotCopper's most watched; Oz inflation at 3.5%