"Conditioning hole prior to running 4½ inch
production casing to TD (8,250 feet).
Successfully recovered Schlumberger FIT tool
from Y-21 sand test. Test at 8,088 feet depth
(23 feet below top of sand at 8,065 feet)
recovered gas & salt water. The upper portion of
the Y-21 sand will be tested through casing at a
later date as will the Y-14, 15 & 19 sands which
appear to be gas-bearing from logs."
This basically means that they have found the GWC at around 8.088 ft. Meaning that the above sand we'll be full of gas.
Great news.
- Forums
- ASX - By Stock
- EMR
- gas water contact
gas water contact
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.53 |
Change
0.030(0.86%) |
Mkt cap ! $2.313B |
Open | High | Low | Value | Volume |
$3.64 | $3.67 | $3.49 | $40.30M | 11.41M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 37322 | $3.51 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.53 | 57046 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1520 | 3.510 |
1 | 1520 | 3.500 |
5 | 61762 | 3.490 |
2 | 8266 | 3.480 |
2 | 8266 | 3.470 |
Price($) | Vol. | No. |
---|---|---|
3.530 | 5820 | 2 |
3.540 | 97680 | 6 |
3.550 | 14664 | 4 |
3.560 | 91978 | 4 |
3.570 | 40020 | 3 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
EMR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online