"Conditioning hole prior to running 4½ inch
production casing to TD (8,250 feet).
Successfully recovered Schlumberger FIT tool
from Y-21 sand test. Test at 8,088 feet depth
(23 feet below top of sand at 8,065 feet)
recovered gas & salt water. The upper portion of
the Y-21 sand will be tested through casing at a
later date as will the Y-14, 15 & 19 sands which
appear to be gas-bearing from logs."
This basically means that they have found the GWC at around 8.088 ft. Meaning that the above sand we'll be full of gas.
Great news.
- Forums
- ASX - By Stock
- gas water contact
"Conditioning hole prior to running 4½ inchproduction casing to...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.81 |
Change
0.040(1.06%) |
Mkt cap ! $2.502B |
Open | High | Low | Value | Volume |
$3.73 | $3.82 | $3.64 | $5.218M | 1.386M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4432 | $3.80 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.81 | 21675 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4432 | 3.800 |
2 | 9320 | 3.780 |
4 | 15107 | 3.770 |
2 | 9320 | 3.760 |
1 | 1631 | 3.750 |
Price($) | Vol. | No. |
---|---|---|
3.810 | 21675 | 1 |
3.820 | 16550 | 2 |
3.830 | 38815 | 6 |
3.840 | 27199 | 3 |
3.850 | 31205 | 5 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
EMR (ASX) Chart |