- Final “Mining Reserve Upgrade” to include at surface material for Yarrabubba. basically means no stripping at surface and the mining schedule should reflect mining from day dot. V205 and titanium output should grow inline with this material being added significantly improving economics.
- Capex tenders completed
- Banakable Model incorporates 1 and 2
- Environmental Approvals ticked off in Q1.
- Further offtake online with Rookie88 above
TMT Price at posting:
35.0¢ Sentiment: Buy Disclosure: Held