Monday's ann. likely to be they have discovered source of water in PB#1 work over using tracer (as long as there was no issues removing tubing) and will proceed to isolate it so the well will continues to flow 4 MMcfd+ dry. Well I hope so. If PB#1 workover succeeds without having the need to do short radius drill then in the short term 10c+ I hope for heads. Then its on for PB#3 the week after with its virgin stimulation. Being a horizontal well could we expect much better flows than PB#1. I hope so. Options looking to be good. DYOR.